Pavement Quality Concrete Check List Before Execution

 Checklist for Quality & Execution Department.

1.    Ensure that miNo matteNo matter what is the environment around you,

It is always possible to maintain your brand of integrity.


*"Good Morning..."*🙏🙏🙏r what is the environment around you,

It is always possible to maintain your brand of integrity.No matter what is the environment around you,

It is always possible to maintain your brand of integrity.


*"Good Morning..."*🙏🙏🙏


*"Good Morning..."*🙏🙏🙏x design is available.Śubha janmadina

2.    Ensure that all the materials are tested & approved and dumped and stacked in an approved manner and sufficient quantity so as to avoid undue interruption.

3.    Only approved plasticizers will be used to improve workability and control water-cement ratio.

4.    Simple and well-defined method should be adopted to control water-cement ratio.

5.    Properly calibrated weigh batcher must be used for concrete production.

6.    Only the approved source of water will be used for constructional water requirements.

7.    If sub-base is found damaged at some places or it has cracks wider than 10mm, it shall be repaired with fine cement concrete before laying the separation membrane.

8.    Separation membrane (125-micron polythene layer) then should be laid flat without crease after duly cleaning the sub-base using an air compressor. Overlaps should not be less than 300 mm.

9.    Examine the forms to ensure that they have the specified attributes including composition, weight, dimensions, rigidity, and cleanliness.

10.  Ensure that every portion of pavement gets sufficient curing by way of marking dates and clearly distinguishing in site records.

11.  Ensure that vibrators are used judiciously to compact fully and at the same time segregation is avoided.

12.  Ensure that samples for compressive strength tests are regularly taken as per the desired frequency of testing.

13.  Width of the pavement being less than 4.5-meter longitudinal joints is not required.

14.  For transverse joints a flat bar/web of mild steel “T” may be placed into concrete which may be pulled out after sufficient hardening of concrete.

15.  Transverse joints are to be filled by approved sealants preceded by primer application.

16.  No vehicular traffic shall be allowed on the pavement before 28 days of its casting.

Checklist For P&M Departme 

Plant Checked and calibrate the plant weigh batch system.

2.    Checked cement, fly ash weight, and load cell working properly.

3.    Plant water tank capacity /quantity/Ph value of water.

4.    Mixing time.

5.    Mixture condition /leakage if any.

6.    Chiller plant working properly/Arrangement for stacking of Ice if any.

7.    Dumper availability.

8.    Dumper inside body ms plate must be smooth so that unloading of pqc will be easy.

9.    Arrangement of admixture dosage.